Skip to content
Large-scale solar PV array at sunrise — atmospheric photography for the project portal (not site-specific photography).
Zhangjiakou RE demonstration zone · Mining-area source-grid-load-storage

Huailai Zhongji Sion Wind-Solar-Storage Plant

A GW-class mining-site renewable asset, behind-the-meter first with surplus export. FSR baseline: Phases I–III 350.83 MWp + 100 MW + 100 MW/200 MWh; total CAPEX ~RMB 1.485 bn.

Hero uses licensed stock photography (Pexels) for atmosphere — not on-site imagery; replace with owner media at launch.

Phases I–III (FSR scope)
PV
350.83 MWp
Wind
100 MW
BESS
100 MW / 200 MWh
See KPI strip & FSR §1.3.2 for footnotes.
KPI 1
[1,2]
350.83
MWp
PV capacity (Phases I–III, peak)
KPI 2
[1]
100
MW
Wind capacity (Phases I–III)
KPI 3
[1]
100 / 200
MW·MWh
Storage power / energy (Phases I–III)
KPI 4
[1,2]
14.85
亿元
Total CAPEX (Phases I–III, est.)
Nine-line-item breakdown in Ch.13
KPI 5
[1,2]
41.5
%
Equity IRR (base case)
Aligned with Monte Carlo P50; see §14.6–§14.8
KPI 6
[1,2]
51.6
亿元
Project NPV (8% discount, 25 years)

Wind · solar · storage · charging — visual language

Imagery sets tone and section identity; it is not on-site photography of this project and may be replaced with owner media.

PV array

PV array

Wind turbines

Wind turbines

EV charging infrastructure

EV charging infrastructure

Battery modules and thermal management

Battery modules and thermal management

Solar modules close-up

Solar modules close-up

Charging dispensers and vehicles

Charging dispensers and vehicles

Industrial site and energy assets

Industrial site and energy assets

Wind farm vista

Wind farm vista

Photo source: Pexels License

Four pillars

Grounded in the FSR: feasible across policy, technology, economics, society, and environment — framed as pillars for executive scanning.

Four-self model

[1]

Self-production, self-crew, self-land, and behind-the-meter supply — structurally lowers unit CAPEX and improves economics vs. grid-purchase tariffs.

Four-phase rollout

[1]

Demo → BIPV sheds → main GW-scale build → strategic reserve — staged CapEx with minimal rework.

Source-grid-load-storage

[1,2]

PV + wind + 4h storage + SVG / AGC-AVC for reliability and power quality in heavy industrial loads.

Digital twin & AI dispatch

[1]

Generation forecasting, full-life SOC tracking, and intelligent dispatch (target NMAE ≤ 8%).

Four-phase roadmap

Phased rollout: validate cheaply, then scale with minimal rework.

PhasePVWindStorageSiteTimelineSource
Phase I (demo)30 kWp5 kW(垂直轴样机)3 MW / 9 MWh(30 台重卡动力电池作储能)100 m² demo shed60 days after construction start[1]
Phase II800 kWp50 kW500 kW / 1 MWh3,000 m² BIPV shed + 100 kW rooftop240 days after start[1,2]
Phase III (main body)350 MWp100 MW100 MW / 200 MWh3,040 mu (~203 ha)26 months after start[1,2]
Phase IV (strategic)1 200 MWp200–400 MW300 MW / 1.2 GWhPortion of 10,000-mu mining areaRolling 5 years[1]
Far future totals (strategic ceiling, per FSR)
[1,2]
PV
1550 MWp
Wind
250500 MW
BESS
400 MW / 1600 MWh

Sustainability snapshot

CO₂
417,000 tCO₂/a

Annual CO₂ avoidance (Phases I–III scope, FSR table)

[1,2]
Jobs
80+

Ops direct ~80; construction peak ~600

[1]
25a CO₂
10,420,000 t / 25a

Cumulative for Phases I–III (§2.3.6)

[1,2]

Latest updates

Investment & partnerships

Bank syndication, equipment finance, partnerships.

Book a briefing
Media & public engagement

Interviews, site visits, fact checks.

Careers

Ops, digital, PM roles (ramping up).

Contact